Production

  • with CO2
  • with H2S
  • with CO2 and H2S

Water Injection

  • clean water
  • brackish water
  • seawater
  • produced water

Gas Injection

  • CO2
  • Methane 


Heavy Oil

  • Production
  • Steam injection
  • SAGD

Top Side Process

  • Choke at top of riser is usually used for flow split control to test and production or to throttle in to get pressure up and prevent slugging